GIB stopping repairs, finished ready for paint

Patched and replaced sections stopped and sanded flat, so the repair disappears and the painter can go straight on. Cracked joints re-stopped, and stopping after small alterations, with over 40 years in the trade.

Calls in the day, texts after 5 pm.It’s after 5 pm, so a text is best.

A freshly painted kitchen with smooth white walls and a crisp ceiling line above a timber benchtop

40+ yearsin the trade

99.3%from 396 customer ratings

Expert repairsa seamless, invisible finish

West Auckland to the Cityhomes, rentals and offices

Paint shows every shortcut

Rushed stopping looks fine until the first coat of paint. Then the joints ridge, screw heads ghost through and the ceiling flashes every time the light moves.

Every Philstop job is finished for the next trade: joints feathered, sanded flat and left as a top finish for the painter to work with. That comes from over 40 years across all GIB stopping procedures and products.

What’s covered

  • Patched and replaced plasterboard sections
  • Re-stopping cracked and failed joints
  • Stopping after small alterations
  • Stopping after electrical work and new fittings
  • Square downlight holes changed to round, and similar cut-outs
  • Putting right earlier stopping that has failed
A tall stairwell with smooth white walls and sharp, clean edges where the planes meet

“Phil clearly takes pride in his work and the result was a high quality finish. The paint went on beautifully on the newly plastered ceiling and kitchen walls.”

Taylor · September 2026

“Phil did an excellent job on demanding 4 meter high ceilings and on extensive negative detailing. I was very pleased with the surface presented for painting.”

Peter · August 2022

“Looking great and ready for the painter.”

Ronald-john · April 2025

From recent jobs

Photos customers took of their own jobs and shared with their reviews.

Kitchen walls and ceiling newly plastered, with drop sheets down and the paint going on
Kitchen walls and ceiling, paint going on. September 2026.
A reboarded kitchen ceiling stopped smooth and ready for paint
Reboarded kitchen ceiling, stopped and ready for paint.
Fresh plaster patches across a green painted wall, mid-job
Patches going on across a painted wall, mid-job.
Stopping joints in a narrow hallway, with drop sheets down and the floor protected
Working a patched wall corner, with a vacuum ready for the clean-up

Need a section stopped?

Say what needs doing and you’ll get a straight answer on timing. Call in the day or text after 5 pm.

Calls in the day, texts after 5 pm.It’s after 5 pm, so a text is best.

CallText